GLEN J NORRIS
CAD HVAC / Ductwork Design Draughtsman
EASTLEIGH
Mobile 078 3667 1676
E-mail GlenJNorris@Btinternet.com Web www.glenjnorris.co.uk
Qualifications: Mechanical and Production Engineering TEC III First Class Pass D.O.B.: 27 June 1959
Mechanical Engineering Technician T2 First Class Pass Martial Status: Married
Training: Air Conditioning and Refrigeration Technology; Parts 1 and 2; Business Edge Ltd.
MicroStation HVAC Eden Code Course; Intergraph Training Centre.
Software: MicroStation V8, AutoCAD, PDS, PE-HVAC, Triforma, HVAC for Triforma,
Equipment Modeling, Interfacet, PlantSpace & TeamMate.
Experience: Over 30 years of fabrication knowledge on ductwork and building issues, 3D modeller for various CAD software. Site based or office working. Site surveys. Ductwork installer. Refrigeration installer.
Career History:
Dec. 2009 League of Friends Moorgreen Hospital, West End, Southampton
To date Voluntary work
Designing & maintaining leagues web site and committee member, helping in the day to day running of the league.
Sept. 2009 WORLEYPARSONS, Brentford. / Pesaro, Italy.
Oct. 2009 MicroStation, PDS Equipment Modeling & AutoCAD Ductwork Co-ordinator
Worked on Sakhalin II project in Brentford & spent 6 months in Italy assisting ductwork vendor (Renco, Italy) to resolve issues to allow ductwork to be fabricated and complete approval of vendor documents.
Duties involved updating 3D models for input into SmartPlant. Also liaising with Hargreaves of Bury to assist in completion of sub ductwork orders for 3mm thick stainless steel ductwork & fume extract systems. NSV, Flamgard and other sub vendors. Checking of all vendor documents for inclusion into installation, commissioning and operating manuals. Also worked on KDPC project in Kazakhstan producing ductwork layouts and 3D models for sub-stations.
June 2009 WML Ltd, Eastleigh
Aug 2009 AutoCAD Ductwork Detailer
Worked on various contracts producing ductwork fabrication drawings, to allow fabrication & installation of company’s projects.
Nov. 2004 WORLEYPARSONS, Brentford. / Pesaro, Italy.
Mar. 2009 MicroStation, HVAC for Triforma, PDS Equipment Modeling & AutoCAD Ductwork Co-ordinator
Mar. 2003 DUKE-FLUOR DANIEL & FLUOR DANIEL, Camberley
Oct. 2004 MicroStation HVAC for Triforma & PDS Equipment Modeling Co-ordinator
Duties in 2002 and 2003 / 4 involved working on TCO’s SGP & SGI projects in Kazakhstan, designing 3D ductwork & HVAC pipe work services for Sub-Stations, Pump houses & Compressor houses etc using HVAC for Triforma, Triforma & Equipment Modeling. Also dealing with ductwork sub contractors in Almaty, Kazakhstan (visit made to their offices) also Hargreaves of Bury, UK. Material take-off’s made for estimations & costing. Also produced civil, structural steel and internal wall layouts to ensure full co-ordination of HVAC services for the base line building out line. Preparation of other disciplines space allocation, for instrument cable tray and electrical routing.
Duties in 1998 were for Warner Lambert (Cork), Gaeleo (Cork) and Fisons (Holmes Chapel) projects 3D ductwork.
Duties in 1996 involved producing ductwork layout drawings using MicroStation V5 and Interfacet V2.5.16
Duties in 1992 / 3 were to produce ductwork layout drawings for plant rooms and clean rooms.
Nov. 2002 FOSTER WHEELER, Reading
Feb. 2003 MicroStation PE-HVAC Ductwork Co-ordinator
Oct. 2002 DUKE-FLUOR DANIEL, Camberley
Nov. 2002 MicroStation HVAC for Triforma Co-ordinator
Oct. 2000 - FOSTER WHEELER, Reading
Oct. 2002 MicroStation PE-HVAC Co-ordinator
May 2000 - ABB BUILDING TECHNOLOGIES, Portsmouth
Oct. 2000 AutoCAD HVAC Co-ordinator
Site based
Mar. 1999 - AIRSYS ATM, Ferndown / Lahore, Pakistan
May 2000 MicroStation HVAC / Ductwork Designer
Airsys designed airports. Contracts worked on were Lahore (Pakistan), Beihai (China) & Kuwait airports. Duties involved producing drawings from 3D models using TeamMate and PlantSpace, all services were fully co-ordinated, produced from engineer’s information via dxf format, for Kuwait airport the approach control room was 3D modelled, then fully rendered in the exact colours, with a 1500 frame flyby video produced using MicroStation images. Also beta tester for HVAC for Triforma.
July 1998 - RAYTHEON E & C Ltd, New Malden
Mar. 1999 MicroStation and AutoCAD HVAC Designer
Contracts worked on included Pliva (Zagreb, Croatia), Saltend (Hull), Pfizer (Sandwich) and other projects within the EEC. Duties on Saltend were to produce ductwork layout drawing using MicroStation 95 for the ventilation systems within the power station; Duties on Pfizer were to assist existing contract staff in completing HVAC drawings.
Apr. 1998 - FLUOR DANIEL Ltd, Camberley
July 1998 AutoCAD HVAC Designer
Aug. 1997 - NOISE REDUCTION Ltd, Eastleigh
Apr. 1998 AutoCAD Designer
Acoustic Engineers manufacturing a range of custom made enclosures and noise reducing systems, Duties were to design enclosures from site dimensions taken on visits to client’s premises for green corrugators, single facers, small motors, waste fans etc projects were world wide.
Sept. 1996 - FLUOR DANIEL LTD, Hook and Camberley
July 1997 MicroStation Interfacet HVAC Ductwork Designer
Aug. 1995- NOISE REDUCTION Ltd, Eastleigh
Dec. 1996 AutoCAD Designer
June 1993 - SNAMPROGETTI Ltd, Basingstoke
Aug. 1995 BSL AutoCAD HVAC Designer
Contracts worked on included Fisons (Loughborough), Hewett/Bacton (Phillips), Bard Pharmaceutical's (Cambridge), Obpolymer (Russia), and Schering (Milan). Duties were to produce drawings, schemes and 3D models for complete ductwork systems using AutoCAD R12 and BSL (UNIX and Dos Platforms) from basic data obtained, using preliminary calculations based on clients brief and CIBSE guides.
Oct. 1992 - FLUOR DANIEL Ltd, Camberley
June 1993 AutoCAD HVAC Ductwork Designer
July 1988 - JOHN BROWN ENGINEERS Ltd, Portsmouth
Mar. 1992 HVAC Designer / CAD Draughtsman
John Brown are designers of Chemistry Pilot Plants. The HVAC department were a small team working with other departments. Contracts worked on Glaxo and Ciba Geigy. Some drawings produced using CAD systems including 'Medusa' - 'PDMS Drawcon' and AutoCAD. Also involved in calculations produced using HevaComp.
Feb. 1988 - HADEN YOUNG LTD, Aldermaston
July 1988 Building Services Co-ordination Draughtsman
Jan. 1987 - WESSEX REGIONAL HEALTH AUTHORITY, Winchester
Feb. 1988 HVAC Designer Draughtsman
Nov. 1986 - AERCON DUCTWORK SERVICES LTD, Eastleigh
Jan. 1987 Contracts Engineer
Sept. 1986 - ELLIS MECHANICAL SERVICES, Park Gate
Nov. 1986 HVAC Contract Draughtsman
Jan. 1986 - CHASE OF TITCHFIELD, Gosport
Sept. 1986 HVAC Designer Draughtsman
June 1984 - COLT INTERNATIONAL, Havant
Jan. 1986 Designer Checker
Apr. 1980 - AERCON DUCTWORK SERVICES LTD, Eastleigh
May 1984 Contracts Engineer
Mar. 1980 - VES of Andover
Apr. 1980 Contract Draughtsman
Apr. 1978- NOISE REDUCTION LTD, Eastleigh
Mar. 1980 Acoustics Designer